Production Director
Jonah Whitfield
Jonah runs the build: timelines, crews, permits, load-in and the run of show. If it has to arrive on a truck, he has already planned the route.
Jonah came to events from live touring, where a show either loads in on time or does not happen. He brought the discipline with him and very little of the chaos.
He owns everything between the drawing and the door: vendor contracts, production schedules, permits, dock times, crew calls and the contingency plan for the Tuesday in August when it rains at four.
His rule for a venue tour is unromantic and reliable — look at the ceiling, the dock and the power before you look at the view.
Jonah’s writing
What Is a Production Budget for an Event?
Understand how a production budget breaks down event costs into creative, technical, labor, rentals, and contingency categories to protect your event’...
A realistic 12-month timeline
What genuinely needs booking at month twelve, month six and month one — and the decisions that get cheaper if you let them wait.
Five rooms we keep coming back to
Underused South Florida venues with good bones, workable load-in and light worth designing around.